Kuruçayırlı Group Energy Group companies completed the first month of 2019 with 37.4% efficiency increase through innovative energy solutions and capacity increase investments. Within the scope of the revision and improvement program carried out in the 3rd quarter of 2018 at the Hydroelectric Power Plants in Kütahya and Artvin, it achieved a 37.4% increase in its 6-month production capacity on the basis of the first quarter values of 2018-2019.
In the fertility that our hydroelectric power plants have the advantage that it is a method where energy can be obtained the cheapest, and that the positive investments in this field are followed by Kuruçayırlı Energy; new energy investments since the first day it was installed in parallel to Turkey’s energy deficit reduction principle of “respect for the innovative and environment” mission with the entry made in made in the energy sector overhaul and the total cumulative Hydropower Manufacturing Facility in the supply increased 0.93% of the production obtained under the improvement program Kuruçayırlı Energy The group has been a pioneer.